PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued fixing the main steel column at the Monumental Stairs Facing East (800x600).jpg Continued installing conduit at Stairs -2 Facing South (800x600).jpg Installed duct hangers along column line D Facing South (800x600).jpg Installed metal decking at Stairs -2 (Roof) Facing East (800x600).jpg Installed wire mesh for the slab on grade at the Monumental Stairs Facing East (800x600).jpg Layed out the embeds and couplers around the 4th Floor Facing West (800x600).jpg Started installing nelson studs at the 2nd floor metal decking Facing West (800x600).jpg
Previous pageNext page Installed duct hangers along column line D Facing South (800x600)
Installed duct hangers along column line D Facing South (800x600)